The U.S. Nuclear Regulatory Commission (NRC) on March 19 issued a final report about an "augmented inspection" at Erwin-based Nuclear Fuel Services, Inc., in connection with an Oct. 13 incident in which an unexpected chemical reaction occurred during processing of radioactive scrap material.
On Tuesday, meanwhile, the NRC authorized NFS to re-start one of its processing lines. All the plant's processing lines have been shut down since late December under an agreement.
REPORT FINDINGS
"The team concluded that the (Oct. 13, 2009) event occurred because multiple error-prevention barriers had failed," said a letter from NRC Regional Administrator Luis A. Reyes to NFS President David Amerine that accompanied the final Augmented Inspection report.
"These failures were primarily attributable to a lack of management oversight of the change management process and a lack of a questioning attitude exhibited by all personnel involved in handling process-change requests," Reyes' letter said.

"A significant change to the uranium aluminum process was made without appropriately compensating for the increase in risk. The significance of the change went undetected by your staff and later resulted in a process upset that potentially could have had a high consequence occupational exposure," Reyes said.
"Processes with a significant potential for a high consequence occupational exposure are required to have sufficient items relied on for safety (IROFS) in place to reduce the risk of exposure.
"The change made to the uranium aluminum process resulted in insufficient IROFS in place for the activity being performed.
"The team also identified performance issues associated with procedural compliance, technical reviews, safety reviews, written evaluations (required to support decisions made without prior NRC approval), and identification of required IROFS for other processes at the facility.

"The team determined that the Nov. 30, 2009, decision to restart the uranium aluminum process was less than adequate because your staff did not have a rigorous technical basis and appropriate management review to support the conclusion that the process was ready for restart.